Water cooling system solution
   +86-510-85160188/85166601

CONTACT US

WUXI FANGZHOU WATER COOLING EQUIPMENT CO.LTD.

TEL:0510-85160188

TEL:0510-85166601

FAX:0510-85166315

TEL:0510-85166602

M B:13771063866

Email:fang-zhou@fang-zhou.com

ADD:

New wind road, Xintai Industrial Park, Wuxi New District

Beijing Road high tech Zone of Ji'an City, Jiangxi Province


Service

Service

售后服務(wù)

Construction commitment and operation training

Construction process

1 buyer to provide on-site installation conditions:

(1) the buyer shall be based on the size of the equipment foundation provided by us;

(2) to provide adequate installation space and installation conditions, power supply, connecting pipelines, general tools, on-site assistance personnel and scheduling personnel, etc..

2 equipment installation of my company sent to the field of technical guidance.

3 construction process:

(1), the equipment and materials in place after the field assembly, the upper and lower boxes on-site installation, water pipes, water pumps installed in place, etc..

(2), with the buyer of the site pipeline connection, flange connection

(3) the installation of control instruments, instruments and the entire control system.

(4) after the installation of the whole process to drive commissioning.

Operation training

Equipment commissioning completion of the site operator training, including the following:

1, cooling tower equipment, principle and operation way to explain

2, the core components and main operating components and maintenance

3, the various parts of the maintenance cycle

4, the various parts maintenance

5, problem solving solutions

6, operating personnel examination and evaluation

Two, service commitment

Customer satisfaction not only provide good products, the ark of the service also includes installation, quality tracking and warranty three major initiatives in the ark of the customer service center also stores customer profile information, demand information, every minute at all for the sake of users, for users to lift the worries.

1 free to provide customers with the operation of training and equipment debugging, and provide the boot before and off the machine before the technical guidance, during the use of equipment to provide the full range of technical services and support.

2 the quantity, quality or technical specifications of the goods are not in conformity with the contract, or if the goods are defective, the supplier shall repair or replace the defective goods or parts free of charge after receiving the notice.

3 equipment put into operation, the damage of the components and quality problems during the warranty period, the supplier free to adjust properly until the user is satisfied; in charge warranty, spare parts costs.

4 the operation of the operation or other relevant cooling tower system, the normal operation of the situation, we have received a report, within 1 hours immediately give the answer and put forward the solution.

5 to provide the cooling tower in environmental protection, energy saving and other aspects of the latest technology free of charge for customers to choose, in the equipment life cycle should be free to use the software to upgrade the equipment.

6 the seller is responsible for the users of the system of free technical training, including equipment, fault diagnosis and maintenance, etc..

7 regular routine inspection and maintenance services.

8 product lifetime service system, the warranty period after the cost of supply parts.

9 we are responsible for guiding the installation of equipment (mechanical connection, electrical connection, the overall adjustment of the equipment, the equipment of the functional test), responsible for the commissioning and commissioning of on-site support and on-site technical training, etc..

Three, enclosed: closed type cooling tower antifreeze measures

The cooler of the closed cooling tower is composed of a lot of purple copper tubes.

Ambient temperature is less than 0 of the user remember antifreeze. After the shutdown, the residual water in the copper pipe will freeze and expand, and effective anti freezing measures should be taken! Our proposed anti freezing measures are as follows:

A device installed in the indoor temperature of 0 degrees Celsius above the place.

Two. If the equipment is installed in the outdoor or in place below 0 DEG c:

1 to the stainless steel water tank and spray water tank to join antifreeze, adding amount of reference to the manufacturer's antifreeze. (be added by the weather conditions) the measures most insurance!!!

2 the equipment in the water or other cooling liquid all discharged, otherwise the equipment will be frozen.

Drainage method: first the water inlet valve is closed, and then, the drain valve is closed below the cooler, the exhaust valve opens above the cooler, air compressor through the exhaust valve to the pump air cooler (5 kg) after the stop, when the pressure gauge pointer stability, open the drain valve, the water and gas cooler discharge. The above operation is repeated several times, until the water is emptied.

The following content as an anti freeze reference:

Importance of A. antifreeze:

In winter, the water cooling equipment installed in the outdoor or indoor environment, when the temperature will fall to 0 degrees below freezing, must take effective measures, it is a simple and effective means of protection equipment, to remind the user to make this work before winter arrived.

Selection and use method of B. anti freezing liquid:

All kinds of Antifreeze on the market, quality is uneven in quality asks the user to purchase, it should pay attention to the choice of brand products. Anti freezing liquid mainly contains "water ethanol", antifreeze is mainly reflected in the water ethanol content, high content for the quality of products.

Anti freezing liquid can be purchased to the chemical industry production enterprise.

The use of antifreeze is very simple, mainly based on the need to freeze the low temperature value to determine the amount of added.

The following example is for reference only:

A local user when the estimated minimum environmental dry bulb temperature (temperature) of -10 DEG C, should add antifreeze 20-30%, 70-80% pure water, in the actual use of water is also found after freezing, should consider to add a certain proportion of antifreeze, until no longer freezes as well.

Example two: the user local year is expected to minimum ambient dry bulb temperature (temperature) of -20 degrees Celsius, should be added 40-50% antifreeze, 50-60% pure water, until it is no longer freezing as well.

According to this analogy, the lower the freezing point, the higher the proportion of antifreeze added, the actual freezing is not frozen, the user should be flexible.

Effect and substitution of C. antifreeze on equipment:

We have proved through theory and practice that the antifreeze solution will not cause corrosion and other effects, but will be slightly increased.

在線客服
 
 
 Contact Details
TEL:0510-85160188
TEL:0510-85166601
TEL:0510-85166602
MB:13771063866
ADD:New wind road, Xintai Industrial Park, Wuxi New District
欧美熟妇浓毛大bbw| 河南妇女毛浓浓bw| 欧美又大粗又爽又黄大片视频| 亚洲人成人无码网www国产| 少妇又紧又色又爽又刺激视频| 国产av无遮挡喷水白浆桃花视频| 双乳被和尚揉着玩弄在线看| 曰本性l交片免费看| 啊快捣烂了啦h男男| 青楼男妓h高潮啊哈男男| 欧产日产国色天香区别视频| 99国产精品白浆在线观看免费| 清冷医生受h打开腿乖听话男男| 日本vs中国vs亚洲看无码| 推特怎么在国内使用| 久久av无码av高潮av| 国产精品毛片va一区二区三区| 天天躁夜夜躁狠狠躁2021| 猛烈顶弄禁欲教官h| 精品一区| 国产成人av| 亚洲熟女一区二区三区| 九色porny真实丨国产大胸| 日本变态残虐特级a片受难| 性久久久久久| 色欲浪潮性色AV无码视频| 国产精品婷婷久久爽一下| 色欲av永久无码精品无码蜜桃| 一本一道人人妻人人妻αv| 四虎成人精品在永久免费| 大白屁股缝里浓黑的毛| 蜜臀av人妻国产精品李丽| 国产精品国产三级国产a| 色婷婷av视频一二三区小说| 花火视频影视大全免费观看| 久久精品人妻一区二区蜜桃| 欧美成人乱码视频xxxx| 99蜜桃在线观看免费视频网站| 国产人妻大战黑人20p| 国产成人一区二区三区影院动漫| 丰满女人又爽又紧又丰满|